PROJECTS
Environment Protection
古天乐代言太阳集团 has been engaged in engineering design of waste incineration project since 1992 and has gathered a wealth of experience in employing the technology of waste incineration to generate power. So far, 古天乐代言太阳集团 has already designed more than 200 waste-to-energy plants such rich experiences make us top-ranking in this field. In recent years, 古天乐代言太阳集团 keeps summing up the experience and searching for optimization and innovation in the technology of generating power from waste incineration.
Chaozhou City Chaoan District Waste Incineration Power Plant Project
Location:Time:
Chao Zhou City Chaoan District Waste Incineration Power Plant locates in Di Lingpu, Shaxi Town, Chaoan Distrct, Chaozhou City. Its daily capacity is 1200 ton domestic waste with 3x400t/d incinerators and 4.0MPa/400℃ exhaust heat boiler and installed capacity 2x15MW.This is a key project of environmental industry in Guangdong Province.
The detail engineering was started from June, 2015 and the plant was put in operation on 1st March, 2018.
Project Awards:
China 2019 Excellent Power Engineering Project, the greatest honor of power project;
First Prize of 2019 Excellent Engineering in Light Industry
Weifang Dongjiang Lanhai Environment Co., Ltd Industrial Solid Waste Reutilization Project
Location:Time:
The Project locates in Changyi City. It includes hazardous waste treatment facilities (capacity:60,000 t/a), materialization/effluent treatment facilities (capacity: 114,000 t/a), i.e. 174,000 t/a.
The design began in Oct, 2016 and the plant has been put into production in June, 2018.
Project Awards:
Second Prize of 2019 Excellent Engineering in Light Industry
Chaozhou City Chaoan District Waste Incineration Power Plant Project
Location:Time:
Chao Zhou City Chaoan District Waste Incineration Power Plant locates in Di Lingpu, Shaxi Town, Chaoan Distrct, Chaozhou City. Its daily capacity is 1200 ton domestic waste with 3x400t/d incinerators and 4.0MPa/400℃ exhaust heat boiler and installed capacity 2x15MW.This is a key project of environmental industry in Guangdong Province.
The detail engineering was started from June, 2015 and the plant was put in operation on 1st March, 2018.
Project Awards:
China 2019 Excellent Power Engineering Project, the greatest honor of power project;
First Prize of 2019 Excellent Engineering in Light Industry
Weifang Dongjiang Lanhai Environment Co., Ltd Industrial Solid Waste Reutilization Project
Location:Time:
The Project locates in Changyi City. It includes hazardous waste treatment facilities (capacity:60,000 t/a), materialization/effluent treatment facilities (capacity: 114,000 t/a), i.e. 174,000 t/a.
The design began in Oct, 2016 and the plant has been put into production in June, 2018.
Project Awards:
Second Prize of 2019 Excellent Engineering in Light Industry
Boluo County Domestic Waste Incineration Power Plant Project
Location:Xinzuo tang village, Huzhen town, Boluo County Time:from Oct,2013 to June, 2015
The project has daily capacity 1050t in two phases: 700 t/d for 1st and 350t/d for 2nd. Civil works has been finished in one time and in phase 2 only equipment installation. In 1st phase there are 2 of 350t/d incinerator, 1×12MW condensation turbine generator unit with 700t/d capacity, i.e annual 255,500t with occupied area 10 hectare and investment of CNY 420 million.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
Changsha City Domestic Waste Comprehensive Treatment (Clean Incineration) Project
Location:Time:
Changsha City Domestic Waste Comprehensive Treatment (Clean Incineration) Project locates in Wangcheng District, Changsha City with total investment 2.586 billion RMB. Daily capacity is 5000 ton/d, which is the largest in China, with 6x850t/d grate incinerator and this configuration is the first example in China. The Chimney height is 180m, the highest in China.
Basic design was completed on Jan, 2015; Detail engineering on Aug,2016; and Completion Acceptance on 28th March, 2019.
Project Awards:
First Prize of 2019 Excellent Engineering in Light Industry
Golden Prize of China 2017-2018 2nd batch Steel Structure Engineering
Boluo County Domestic Waste Incineration Power Plant Project
Location:Xinzuo tang village, Huzhen town, Boluo County Time:from Oct,2013 to June, 2015
The project has daily capacity 1050t in two phases: 700 t/d for 1st and 350t/d for 2nd. Civil works has been finished in one time and in phase 2 only equipment installation. In 1st phase there are 2 of 350t/d incinerator, 1×12MW condensation turbine generator unit with 700t/d capacity, i.e annual 255,500t with occupied area 10 hectare and investment of CNY 420 million.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
Changsha City Domestic Waste Comprehensive Treatment (Clean Incineration) Project
Location:Time:
Changsha City Domestic Waste Comprehensive Treatment (Clean Incineration) Project locates in Wangcheng District, Changsha City with total investment 2.586 billion RMB. Daily capacity is 5000 ton/d, which is the largest in China, with 6x850t/d grate incinerator and this configuration is the first example in China. The Chimney height is 180m, the highest in China.
Basic design was completed on Jan, 2015; Detail engineering on Aug,2016; and Completion Acceptance on 28th March, 2019.
Project Awards:
First Prize of 2019 Excellent Engineering in Light Industry
Golden Prize of China 2017-2018 2nd batch Steel Structure Engineering
Dongguan Machong Waste Treatment Plant
Location:Haixin Sha, Dabu village, Machong town, Dongguan city, Guangdong provinceTime:from Sep,2015 to Jan, 2017
The project has 3 of 500 t/d incinerators,2×18MW condensation turbine generator unit with 1500t/d capacity, i.e annual 540,000t with occupied area 6.8 hectare and investment of CNY 760 million.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
The expected annual power generation is 258 million kWh and 200 million kWh on-grid.
Zhuhai Environmental Protection Biomass Thermal Power Project
Location:Qixing village, Fushan Industry Park, Doumen, Zhuhai cityTime:from Apr,2015 to Nov, 2016
The project has 2 of 600 t/d incinerators,2×12MW condensation turbine + 2×15MW generator unit with 1200t/d capacity, i.e annual 430,000t with occupied area 5.54 hectare.
The expected annual power generation is 182.5 million kWh and 149.6 million kWh on-grid.
Dongguan Machong Waste Treatment Plant
Location:Haixin Sha, Dabu village, Machong town, Dongguan city, Guangdong provinceTime:from Sep,2015 to Jan, 2017
The project has 3 of 500 t/d incinerators,2×18MW condensation turbine generator unit with 1500t/d capacity, i.e annual 540,000t with occupied area 6.8 hectare and investment of CNY 760 million.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
The expected annual power generation is 258 million kWh and 200 million kWh on-grid.
Zhuhai Environmental Protection Biomass Thermal Power Project
Location:Qixing village, Fushan Industry Park, Doumen, Zhuhai cityTime:from Apr,2015 to Nov, 2016
The project has 2 of 600 t/d incinerators,2×12MW condensation turbine + 2×15MW generator unit with 1200t/d capacity, i.e annual 430,000t with occupied area 5.54 hectare.
The expected annual power generation is 182.5 million kWh and 149.6 million kWh on-grid.
Guangzhou No.4 Resource Thermal Power Plant
Location:Xinlian Er villiage, Dagang town, Nansha district, Guangzhou city, Guangdong provinceTime:will be completed by Oct, 2016
The project has 3 of 750 t/d incinerators,2×25MW condensation turbine generator unit with 2000t/d capacity, i.e annual 720,000t with occupied area 9.43 hectare and investment of CNY 1.3 billion.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
The expected annual power generation is 250 million kWh and 210 million kWh on-grid.
Zhanjiang Domestic Waste Incineration Power Plant
Location:Zhanjiang city, Guangdong provinceTime:from Sep, 2014 to Apr, 2016
The EPC project has 3 of 500 t/d incinerators,2×25MW condensation turbine generator unit with 1500t/d capacity, i.e annual 540,000t with occupied area 9.43 hectare and investment of CNY 1.3 billion.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
The expected annual power generation is 160 million kWh and 130 million kWh on-grid.
Guangzhou No.4 Resource Thermal Power Plant
Location:Xinlian Er villiage, Dagang town, Nansha district, Guangzhou city, Guangdong provinceTime:will be completed by Oct, 2016
The project has 3 of 750 t/d incinerators,2×25MW condensation turbine generator unit with 2000t/d capacity, i.e annual 720,000t with occupied area 9.43 hectare and investment of CNY 1.3 billion.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
The expected annual power generation is 250 million kWh and 210 million kWh on-grid.
Zhanjiang Domestic Waste Incineration Power Plant
Location:Zhanjiang city, Guangdong provinceTime:from Sep, 2014 to Apr, 2016
The EPC project has 3 of 500 t/d incinerators,2×25MW condensation turbine generator unit with 1500t/d capacity, i.e annual 540,000t with occupied area 9.43 hectare and investment of CNY 1.3 billion.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
The expected annual power generation is 160 million kWh and 130 million kWh on-grid.
Nanjing Jiangnan Jingmai Industry Park Waste Incineration Power Plant Project
Location: Jiangnan Jingmai Industry Park, Jiangning district, Nanjing cityTime:from July, 2012 to May, 2014
The project has 4 of 500 t/d incinerators,2×25MW condensation turbine generator unit with 2000t/d capacity, i.e annual 720,000t with occupied area 13.8 hectare and investment of CNY XXXX.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
The expected annual power generation is 352 million kWh and 296 million kWh on-grid.
Ningbo Beilun Domestic Waste Incineration Power Plant
Location:Baifeng town, Beilun district, Ningbo city, Zhejiang provinceTime:Phase 1 completed in 2014 and Phase 2 in 2015
The project has daily capacity 1500t in two phases: 1000 t/d for 1st and 500t/d for 2nd with occupied area 5 hectare. In 1st phase there are 2 of 500t/d incinerator, 1×12MW condensation turbine generator unit with 700t/d capacity, i.e annual 233,000t and in the other phase and there is one 500t/d incinerator, 1×9MW condensation turbine generator unit with 700t/d capacity, i.e annual 165,000t.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
Nanjing Jiangnan Jingmai Industry Park Waste Incineration Power Plant Project
Location: Jiangnan Jingmai Industry Park, Jiangning district, Nanjing cityTime:from July, 2012 to May, 2014
The project has 4 of 500 t/d incinerators,2×25MW condensation turbine generator unit with 2000t/d capacity, i.e annual 720,000t with occupied area 13.8 hectare and investment of CNY XXXX.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
The expected annual power generation is 352 million kWh and 296 million kWh on-grid.
Ningbo Beilun Domestic Waste Incineration Power Plant
Location:Baifeng town, Beilun district, Ningbo city, Zhejiang provinceTime:Phase 1 completed in 2014 and Phase 2 in 2015
The project has daily capacity 1500t in two phases: 1000 t/d for 1st and 500t/d for 2nd with occupied area 5 hectare. In 1st phase there are 2 of 500t/d incinerator, 1×12MW condensation turbine generator unit with 700t/d capacity, i.e annual 233,000t and in the other phase and there is one 500t/d incinerator, 1×9MW condensation turbine generator unit with 700t/d capacity, i.e annual 165,000t.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
Wujiang Domestic Waste Incineration Power Plant Project
Location:Wujiang city, Jiangsu provinceTime:will be completed by the end of 2016
The project has 2 of 750 t/d incinerators,2×18MW condensation turbine generator unit with 1500t/d capacity, i.e annual 500,000t with occupied area 6 hectare.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
Lanzhou Zhongpu Zi Domestic Waste Incineration Power Plant Project
Location:Zhonghe town, Lanzhou city, Gansu provinceTime:from June, 2014 to 2016 expectedly
The project has daily capacity 3000t in two phases: 2000 t/d for 1st and 1000t/d for 2nd. In 1st phase there are 3 of 670t/d incinerator, 2×20MW condensation turbine generator unit with 2000t/d capacity, i.e annual 667,000t with occupied area 10 hectare. The phase 2 is reserved for construction.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
Wujiang Domestic Waste Incineration Power Plant Project
Location:Wujiang city, Jiangsu provinceTime:will be completed by the end of 2016
The project has 2 of 750 t/d incinerators,2×18MW condensation turbine generator unit with 1500t/d capacity, i.e annual 500,000t with occupied area 6 hectare.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
Lanzhou Zhongpu Zi Domestic Waste Incineration Power Plant Project
Location:Zhonghe town, Lanzhou city, Gansu provinceTime:from June, 2014 to 2016 expectedly
The project has daily capacity 3000t in two phases: 2000 t/d for 1st and 1000t/d for 2nd. In 1st phase there are 3 of 670t/d incinerator, 2×20MW condensation turbine generator unit with 2000t/d capacity, i.e annual 667,000t with occupied area 10 hectare. The phase 2 is reserved for construction.
Mature and advanced incineration technology is used for the project and the construction complies with latest national environmental standards.
Zhuhai Medical Waste Incineration Plant
Location:Zhuhai city, Guangdong provinceTime: completed in 2013
The project is for medical waste treatment with total capacity of 10t/d in two phases, one of which has capacity of 5t/d.
Hunan Li Ang Li County Biomass Power Plant
Location:Ba Yinsong village, Li County, Changde city, Hunan provinceTime:2008
Construction period: Phase 1 from Aug, 2008 to Aug, 2009;Phase 2 from Dec, 2009 to July, 2010
The project has 2 of 75t/h biomass boiler and 2 sets of 15MW condensation turbine generator unit with daily biomass consumption 940 t, i.e. annual 280,800 t. Total investment is CNY 240 million and occupied area is 13.33 hectare. The process set-up is two boilers and two generators. Bag dust remover is used for smoke clarification. In addition, circulating fluidized bed boiler is used as the key equipment to fulfill the combustion requirements of straw.
The expected annual power generation is 195 million kWh and 171.6 million kWh on-grid.
Zhuhai Medical Waste Incineration Plant
Location:Zhuhai city, Guangdong provinceTime: completed in 2013
The project is for medical waste treatment with total capacity of 10t/d in two phases, one of which has capacity of 5t/d.
Hunan Li Ang Li County Biomass Power Plant
Location:Ba Yinsong village, Li County, Changde city, Hunan provinceTime:2008
Construction period: Phase 1 from Aug, 2008 to Aug, 2009;Phase 2 from Dec, 2009 to July, 2010
The project has 2 of 75t/h biomass boiler and 2 sets of 15MW condensation turbine generator unit with daily biomass consumption 940 t, i.e. annual 280,800 t. Total investment is CNY 240 million and occupied area is 13.33 hectare. The process set-up is two boilers and two generators. Bag dust remover is used for smoke clarification. In addition, circulating fluidized bed boiler is used as the key equipment to fulfill the combustion requirements of straw.
The expected annual power generation is 195 million kWh and 171.6 million kWh on-grid.
Rudong Municipal Solid Waste Incineration Power Plant
Location:Rudong xianTime:2009
Construction Location:Dong'an Technology Zone Rudong County
Jiangsu Province, China
Area Covered:100 mu(66667
sq.m)
Construction Scale:Waste Handling Capacity: 1000 t/d;
365000 t/a
Equipments:Waste Incinerators: 2×250 t/d +1×500
t/d grate incinerators
Steam Turbine-generators: 1×12
MW+1×7.5 MW
Investment Scale:316.5 million
yuan
Description:The plant adopted the foreign mature and
advanced burning technology. And it is constructed by the national newest
environmental protection standard.
Zhenjiang Municipal Solid Waste Incineration Power Plant
Location:ZhenjiangTime:2009
Construction Location:Dianshang Village Xinqu Town Zhenjiang
Jiangsu Province, China
Area Covered:206 mu(137667
sq.m)
Construction Scale:Waste Handling Capacity: 1000 t/d;
365000 t/a
Power Output (for sale): 100 million
kWh/a
Equipments:Waste Incinerators: 3×350 t/d grate
incinerators
Steam Turbine-generators: 2×12
MW
Investment Scale:413 million
yuan
Description:The plant adopted the foreign mature and
advanced burning technology. The main emission standard of air pollutants
consults DIRECTIVE 2000/76/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 4
December 2000 on the incineration of waste.
Rudong Municipal Solid Waste Incineration Power Plant
Location:Rudong xianTime:2009
Construction Location:Dong'an Technology Zone Rudong County
Jiangsu Province, China
Area Covered:100 mu(66667
sq.m)
Construction Scale:Waste Handling Capacity: 1000 t/d;
365000 t/a
Equipments:Waste Incinerators: 2×250 t/d +1×500
t/d grate incinerators
Steam Turbine-generators: 1×12
MW+1×7.5 MW
Investment Scale:316.5 million
yuan
Description:The plant adopted the foreign mature and
advanced burning technology. And it is constructed by the national newest
environmental protection standard.
Zhenjiang Municipal Solid Waste Incineration Power Plant
Location:ZhenjiangTime:2009
Construction Location:Dianshang Village Xinqu Town Zhenjiang
Jiangsu Province, China
Area Covered:206 mu(137667
sq.m)
Construction Scale:Waste Handling Capacity: 1000 t/d;
365000 t/a
Power Output (for sale): 100 million
kWh/a
Equipments:Waste Incinerators: 3×350 t/d grate
incinerators
Steam Turbine-generators: 2×12
MW
Investment Scale:413 million
yuan
Description:The plant adopted the foreign mature and
advanced burning technology. The main emission standard of air pollutants
consults DIRECTIVE 2000/76/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 4
December 2000 on the incineration of waste.
Wenling Waste Incineration Power Plant
Location:Wenling Time:2009
Construction Location:Wenling waste landfill site Zhejiang
Province, China
Area Covered:28080
sq.m
Construction Scale:Waste Handling Capacity: 700 t/d;
255500 t/a
Equipments:Waste Incinerators: 2×350 t/d grate
incinerators
Steam Turbine-generators:1×12
MW
Investment Scale:270 million yuan
Datang Huayin Xiangtan Environmental Protection Power Plant
Location:XiangtanTime:2009
Construction Location: Jianshe Village Shuangma Town Yuetang
District Xiangtan Hunan Province, China
Construction
Scale:Landfill Gas Handling Capacity: 800Nm3/h
Power
Output: 957 kW
Equipments:Landfill Gas Handling
Equipments: 1×800 Nm3/h
Torch Burning System: 30~500
Nm3/h
Internal Combustion Generating Sets: 1×957
kW
Investment Scale:18.03 million
yuan
Description:This project was built in Shuangma Landfill
Site. We designed and placed 19 shafts for bleeding the landfill gas. There is
45 Nm3/h landfill gas per shaft.
Wenling Waste Incineration Power Plant
Location:Wenling Time:2009
Construction Location:Wenling waste landfill site Zhejiang
Province, China
Area Covered:28080
sq.m
Construction Scale:Waste Handling Capacity: 700 t/d;
255500 t/a
Equipments:Waste Incinerators: 2×350 t/d grate
incinerators
Steam Turbine-generators:1×12
MW
Investment Scale:270 million yuan
Datang Huayin Xiangtan Environmental Protection Power Plant
Location:XiangtanTime:2009
Construction Location: Jianshe Village Shuangma Town Yuetang
District Xiangtan Hunan Province, China
Construction
Scale:Landfill Gas Handling Capacity: 800Nm3/h
Power
Output: 957 kW
Equipments:Landfill Gas Handling
Equipments: 1×800 Nm3/h
Torch Burning System: 30~500
Nm3/h
Internal Combustion Generating Sets: 1×957
kW
Investment Scale:18.03 million
yuan
Description:This project was built in Shuangma Landfill
Site. We designed and placed 19 shafts for bleeding the landfill gas. There is
45 Nm3/h landfill gas per shaft.
Biogas Power generation Project Of Jiangyin Municipal Solid Waste Incineration Power Plant Leachate Treatment Station
Location:JiangYinTime:2009
Construction Location:Jiangyin Municipal Solid Waste
Incineration Power Plant Jiangsu Province, China
Construction
Scale:Landfill Gas Handling Capacity: 300 Nm3/h
Power
Output: 360 kW
Equipments:Landfill Gas Handling
Equipments: 1×300 Nm3/h
Internal Combustion Generating Sets: 2×180 kW
Investment Scale:2.6 million
yuan
Description:This project was built in Jiangyin
Municipal Solid Waste Incineration Power Plant. The raw material is biogas which
is producted by waste leachate.
Jiangyin Municipal Solid Waste Incineration Power Plant
Location:JiangyinTime:2008
Construction Location:Qinhuang Village Yuecheng Town
Jiangyin Jiangsu Province, China |
Biogas Power generation Project Of Jiangyin Municipal Solid Waste Incineration Power Plant Leachate Treatment Station
Location:JiangYinTime:2009
Construction Location:Jiangyin Municipal Solid Waste
Incineration Power Plant Jiangsu Province, China
Construction
Scale:Landfill Gas Handling Capacity: 300 Nm3/h
Power
Output: 360 kW
Equipments:Landfill Gas Handling
Equipments: 1×300 Nm3/h
Internal Combustion Generating Sets: 2×180 kW
Investment Scale:2.6 million
yuan
Description:This project was built in Jiangyin
Municipal Solid Waste Incineration Power Plant. The raw material is biogas which
is producted by waste leachate.
Jiangyin Municipal Solid Waste Incineration Power Plant
Location:JiangyinTime:2008
Construction Location:Qinhuang Village Yuecheng Town
Jiangyin Jiangsu Province, China |
Zhenhai District Waste Incineration Power Plant, Ningbo City
Location:NingboTime:2007
Construction Location:Ningbo Chemical Area Zhenhai district
Ningbo Zhejiang Province, China
Area Covered:110 mu(73333
sq.m)
Construction Scale:Waste Handling Capacity: 700 t/d;
255500 t/a
Equipments:Waste Incinerators: 2×350 t/d grate
incinerators
Steam Turbine-generators: 1×12
MW
Investment Scale:270 million
yuan
Description:This plant adopts the CFB incinerators
designed by Chinese Academy Of Sciences. And it is constructed by the national
newest environmental protection standard.
Shenzhen Xiaping Landfill Site Biogas Power Plant
Location:ShenzhenTime:2007
Construction Location:Xiaping Landfill Site Shenzhen
Guangdong Province, China
Construction Scale:Power Output:
6000 kW
Equipments:Internal Combustion Generating Sets:
1×1265 kW+1×500 kW+4×1064 kW
Description:This plant was
built in Xiaping Landfill Site and separated to 3 phases. The construction
scales are 1×1265 kW+1×500 kW in phase 1,2×1064 kW in phase 2 and 2×1064 kW in
phase 3. For now all the sets have run.
Zhenhai District Waste Incineration Power Plant, Ningbo City
Location:NingboTime:2007
Construction Location:Ningbo Chemical Area Zhenhai district
Ningbo Zhejiang Province, China
Area Covered:110 mu(73333
sq.m)
Construction Scale:Waste Handling Capacity: 700 t/d;
255500 t/a
Equipments:Waste Incinerators: 2×350 t/d grate
incinerators
Steam Turbine-generators: 1×12
MW
Investment Scale:270 million
yuan
Description:This plant adopts the CFB incinerators
designed by Chinese Academy Of Sciences. And it is constructed by the national
newest environmental protection standard.
Shenzhen Xiaping Landfill Site Biogas Power Plant
Location:ShenzhenTime:2007
Construction Location:Xiaping Landfill Site Shenzhen
Guangdong Province, China
Construction Scale:Power Output:
6000 kW
Equipments:Internal Combustion Generating Sets:
1×1265 kW+1×500 kW+4×1064 kW
Description:This plant was
built in Xiaping Landfill Site and separated to 3 phases. The construction
scales are 1×1265 kW+1×500 kW in phase 1,2×1064 kW in phase 2 and 2×1064 kW in
phase 3. For now all the sets have run.
Shanghai Laogang Solid Waste Landfill Site Biogas Power Project
Location:ShangHaiTime:2007
Construction Location:Laogang Solid Waste Landfill Site
Shanghai City, China
Construction Scale:Landfill Gas
Handling Capacity: 5100 Nm3/h
Power Output: 2500
kW
Equipments:Landfill Gas Handling Equipments: 5100
Nm3/h
Internal Combustion Generating Sets: 2×1250 kW
Mengniu Aoya Model Pastureland Biogas Power Plant and Synthetic Utilization Project
Location:Mongolia(Huhhot)Time:2007
Construction Location:Shengle Ecnomic Garden Helin County
Huhhot Inner Mongolian Autonomous Region, China
Construction
Scale:Power Output: 1260 kW
Equipments:Internal
Combustion Generating Sets: 1×1260 kW
Investment Scale:45
million yuan
Description:This project was built in Mengniu
Aoya Model Pastureland. The raw material is biogas which is producted by cow
dung. It is the first synthetic utilization project of animals’ dung of Chinese
dairy industry. So it is considered possessing strong model value and economic
utilization value.
Shanghai Laogang Solid Waste Landfill Site Biogas Power Project
Location:ShangHaiTime:2007
Construction Location:Laogang Solid Waste Landfill Site
Shanghai City, China
Construction Scale:Landfill Gas
Handling Capacity: 5100 Nm3/h
Power Output: 2500
kW
Equipments:Landfill Gas Handling Equipments: 5100
Nm3/h
Internal Combustion Generating Sets: 2×1250 kW
Mengniu Aoya Model Pastureland Biogas Power Plant and Synthetic Utilization Project
Location:Mongolia(Huhhot)Time:2007
Construction Location:Shengle Ecnomic Garden Helin County
Huhhot Inner Mongolian Autonomous Region, China
Construction
Scale:Power Output: 1260 kW
Equipments:Internal
Combustion Generating Sets: 1×1260 kW
Investment Scale:45
million yuan
Description:This project was built in Mengniu
Aoya Model Pastureland. The raw material is biogas which is producted by cow
dung. It is the first synthetic utilization project of animals’ dung of Chinese
dairy industry. So it is considered possessing strong model value and economic
utilization value.
Dongguan Urban Area Waste Incineration Power Plant
Location:DongguanTime:2006
Construction Location:Shuilian Village Nancheng District
Dongguan Guangdong Province, China
Area Covered:61706
sq.m
Construction Scale:Waste Handling Capacity: 1200 t/d;
438000 t/a
Equipments:Waste Incinerators: 3×400 t/d CFB
incinerators
Steam Turbine-generators: 2×15
MW
Investment Scale:320 million
yuan
Description:This plant adopts the CFB incinerators
designed by Chinese Academy Of Sciences. And it is constructed by the national
newest environmental protection standard.
Suzhou Qizishan Landfill Site Biogas Power Plant
Location:SuZhouTime:2006
Construction Location:Qizishan Landfill Site Suzhou Jiangsu
Province, China
Construction Scale:Landfill Gas Handling
Capacity: 1600Nm3/h
Power Output: 2530
kW
Equipments:Landfill Gas Handling Equipments: 2×800
Nm3/h
Internal Combustion Generating Sets: 2×1365
kW
Investment Scale:27.35 million
yuan
Description:This project was built in Qizishan Landfill
Site.
Dongguan Urban Area Waste Incineration Power Plant
Location:DongguanTime:2006
Construction Location:Shuilian Village Nancheng District
Dongguan Guangdong Province, China
Area Covered:61706
sq.m
Construction Scale:Waste Handling Capacity: 1200 t/d;
438000 t/a
Equipments:Waste Incinerators: 3×400 t/d CFB
incinerators
Steam Turbine-generators: 2×15
MW
Investment Scale:320 million
yuan
Description:This plant adopts the CFB incinerators
designed by Chinese Academy Of Sciences. And it is constructed by the national
newest environmental protection standard.
Suzhou Qizishan Landfill Site Biogas Power Plant
Location:SuZhouTime:2006
Construction Location:Qizishan Landfill Site Suzhou Jiangsu
Province, China
Construction Scale:Landfill Gas Handling
Capacity: 1600Nm3/h
Power Output: 2530
kW
Equipments:Landfill Gas Handling Equipments: 2×800
Nm3/h
Internal Combustion Generating Sets: 2×1365
kW
Investment Scale:27.35 million
yuan
Description:This project was built in Qizishan Landfill
Site.
Nanhai Environmental Protection Power Plant
Location:NanhaiTime:2002
Construction Location:Nanhai District Foshan Guangdong
Province, China
Area Covered:65706
sq.m
Construction Scale:Waste Handling Capacity: 400 t/d;
146000 t/a
Equipments:Waste Incinerators: 2×200 t/d grate
incinerators
Steam Turbine-generators:1×12
MW
Investment Scale:200 million yuan
Zhuhai Waste Incineration Power Plant
Location:ZhuhaiTime:2000
Construction Location:Qingsong Road Nanxi Qianshan Zhuhai
Guangdong Province, China
Construction Scale:Waste Handling
Capacity: 600 t/d; 219000 t/a
Equipments:Waste
Incinerators: 3×200 t/d grate incinerators
Steam
Turbine-generators:1×6 MW
Investment Scale:202
million yuan
Description:This project was awarded the the
first prize in 10th Excellent Project Design Competition of Light Industry, and
the bronze medal in 10th Nation Excellent Design Competition.
Nanhai Environmental Protection Power Plant
Location:NanhaiTime:2002
Construction Location:Nanhai District Foshan Guangdong
Province, China
Area Covered:65706
sq.m
Construction Scale:Waste Handling Capacity: 400 t/d;
146000 t/a
Equipments:Waste Incinerators: 2×200 t/d grate
incinerators
Steam Turbine-generators:1×12
MW
Investment Scale:200 million yuan
Zhuhai Waste Incineration Power Plant
Location:ZhuhaiTime:2000
Construction Location:Qingsong Road Nanxi Qianshan Zhuhai
Guangdong Province, China
Construction Scale:Waste Handling
Capacity: 600 t/d; 219000 t/a
Equipments:Waste
Incinerators: 3×200 t/d grate incinerators
Steam
Turbine-generators:1×6 MW
Investment Scale:202
million yuan
Description:This project was awarded the the
first prize in 10th Excellent Project Design Competition of Light Industry, and
the bronze medal in 10th Nation Excellent Design Competition.
Li'ang Lixian Biomass Power Plavt, Hunan Prov.
Location:LixianTime:2009年
Construction Location:Lixian Hunan Province,
China
Area Covered:565 mu(377667
sq.m)
Construction Scale:Biomass Handling Capacity: 150 t/d;
365000 t/a
Equipments:Biomass Incinerators: 2×75 t/d CFB
incinerators
Steam Turbine-generators: 2×15
MW
Investment Scale:195 million
yuan
Description:This plant was separated to 2 phases. The
construction scales are 1×75 t/d CFB incinerator +1×15MW steam turbine-generator
in phase 1, and the same in phase 2. For now the second phase project has been
constructed.
Changzhou Municipal Solid Waste Incineration Power Plant
Location:ChangzhouTime:2008
Area Covered:75 mu(50000 sq.m)
Construction Scale:Waste Handling Capacity: 800 t/d; 292000 t/a
Power Output (for sale):77 million kWh/a
Equipments:Waste Incinerators: 2×400 t/d grate incinerators
Steam Turbine-generators: 1×12 MW
Investment Scale:412 million yuan
Description:The plant adopted the foreign mature and advanced burning technology. The main emission standard of air pollutants consults DIRECTIVE 2000/76/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 4 December 2000 on the incineration of waste. The leachate processing was treated to the Grade-one A emission standard and re-cycled in the plant. The project was checked and accepted by Jiangsu Provincial Construction Department with 98 point mark, which is the highest point in Chinese incineration power plants.
Li'ang Lixian Biomass Power Plavt, Hunan Prov.
Location:LixianTime:2009年
Construction Location:Lixian Hunan Province,
China
Area Covered:565 mu(377667
sq.m)
Construction Scale:Biomass Handling Capacity: 150 t/d;
365000 t/a
Equipments:Biomass Incinerators: 2×75 t/d CFB
incinerators
Steam Turbine-generators: 2×15
MW
Investment Scale:195 million
yuan
Description:This plant was separated to 2 phases. The
construction scales are 1×75 t/d CFB incinerator +1×15MW steam turbine-generator
in phase 1, and the same in phase 2. For now the second phase project has been
constructed.
Changzhou Municipal Solid Waste Incineration Power Plant
Location:ChangzhouTime:2008
Area Covered:75 mu(50000 sq.m)
Construction Scale:Waste Handling Capacity: 800 t/d; 292000 t/a
Power Output (for sale):77 million kWh/a
Equipments:Waste Incinerators: 2×400 t/d grate incinerators
Steam Turbine-generators: 1×12 MW
Investment Scale:412 million yuan
Description:The plant adopted the foreign mature and advanced burning technology. The main emission standard of air pollutants consults DIRECTIVE 2000/76/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 4 December 2000 on the incineration of waste. The leachate processing was treated to the Grade-one A emission standard and re-cycled in the plant. The project was checked and accepted by Jiangsu Provincial Construction Department with 98 point mark, which is the highest point in Chinese incineration power plants.
Jining Household Waste Incineration Power Plant
Location:Jining,shandongTime:2012
Capacity: about 190 million kW/h;
Power output(for sale): about 160 million kW/h;
Equipment: CFB waste incinerator:3×500t/day;
Steam turbine generator:2×15 MW; urban household waste and coal used as mixture fuel; the ratio of household waste and coal 9:1~95:5; two sets of fuel supply systems.
Suqian Household Waste Incineration Power Plant
Location:SuqianTime:
Equipment: Mechanical grate type waste incinerator:2×300t/day; steam turbine generator:1×12 MW
1.An integrated set of mechanical grate type waste incinerator and HRSG, adopt layer combustion technology, the most popular and has the greatest handling capacity around the world.
2.The flue gas treatment process:semi-dry lime ( rotating spray ) + Activated Carbon + baghouse.
3.Turbine generator: medium pressure, single cylinder EC turbine generator.
4. Main steam system: centralized master control system.
Jining Household Waste Incineration Power Plant
Location:Jining,shandongTime:2012
Capacity: about 190 million kW/h;
Power output(for sale): about 160 million kW/h;
Equipment: CFB waste incinerator:3×500t/day;
Steam turbine generator:2×15 MW; urban household waste and coal used as mixture fuel; the ratio of household waste and coal 9:1~95:5; two sets of fuel supply systems.
Suqian Household Waste Incineration Power Plant
Location:SuqianTime:
Equipment: Mechanical grate type waste incinerator:2×300t/day; steam turbine generator:1×12 MW
1.An integrated set of mechanical grate type waste incinerator and HRSG, adopt layer combustion technology, the most popular and has the greatest handling capacity around the world.
2.The flue gas treatment process:semi-dry lime ( rotating spray ) + Activated Carbon + baghouse.
3.Turbine generator: medium pressure, single cylinder EC turbine generator.
4. Main steam system: centralized master control system.
Honghu Li'ang Bio-power Plant
Location:Honghu, HubeiTime:
Total area: 130 mu;
Construction scale: biomass handling capacity 533 t/day, 144,300 t/year;
Investment scale: 133 million RMB;
Equipment: one 90t/h biomass boiler and one 20MW steam turbine generator;
Baghouse for flue gas treatment and CFB technology for waste incineration.
Eastern Suburb Kunming Municipal Solid Waste Incineration Power Plant
Location:KunmingTime:2010
Construction Location:Kunming City Yunnan Province, China
Area Covered:100470 sq.m
Construction Scale:Waste Handling Capacity: 1600 t/d; 584000 t/a
Power Output (for sale): 200 million kWh/a
Equipments:Waste Incinerators: 4×400 t/d CFB incinerators(one prepared)
Steam Turbine-generators: 2×15 MW
Investment Scale:450 million yuan
Description:This plant adopts the CFB incineration patented technology developed by Zhejiang University. And it is constructed by the national newest environmental protection standard.
Honghu Li'ang Bio-power Plant
Location:Honghu, HubeiTime:
Total area: 130 mu;
Construction scale: biomass handling capacity 533 t/day, 144,300 t/year;
Investment scale: 133 million RMB;
Equipment: one 90t/h biomass boiler and one 20MW steam turbine generator;
Baghouse for flue gas treatment and CFB technology for waste incineration.
Eastern Suburb Kunming Municipal Solid Waste Incineration Power Plant
Location:KunmingTime:2010
Construction Location:Kunming City Yunnan Province, China
Area Covered:100470 sq.m
Construction Scale:Waste Handling Capacity: 1600 t/d; 584000 t/a
Power Output (for sale): 200 million kWh/a
Equipments:Waste Incinerators: 4×400 t/d CFB incinerators(one prepared)
Steam Turbine-generators: 2×15 MW
Investment Scale:450 million yuan
Description:This plant adopts the CFB incineration patented technology developed by Zhejiang University. And it is constructed by the national newest environmental protection standard.
Anqing Municipal Solid Waste Incineration Power Plant
Location:AnqingTime:2010
Construction Location:Xijiaoshankou Xiang Anqing City Anhui Province, China
Area Covered:69713 sq.m
Construction Scale:Waste Handling Capacity: 1000 t/d; 365000 t/a
Equipments:Waste Incinerators: 2×500 t/d CFB incinerators(one prepared)
Steam Turbine-generators: 2×12 MW
Investment Scale:280 million yuan
Description:This plant adopts the CFB incinerators designed by Chinese Academy Of Sciences. And it is constructed by the national newest environmental protection standard.
Changde Municipal Solid Waste Incineration Power Plant
Location:ChangdeTime:2010
Construction Location:Hejiaping Village Deshan Development Zone Changde City Hunan Province, China
Area Covered:100 mu(67777 sq.m)
Construction Scale:Waste Handling Capacity: 800 t/d; 292000 t/a
Power Output: 99.2 million kWh/a
Equipments:Waste Incinerators: 2×500 t/d CFB incinerators(one prepared)
Steam Turbine-generators: 2×12 MW
Investment Scale:280 million yuan
Description:This plant adopts the CFB incinerators designed by Chinese Academy Of Sciences. And it is constructed by the national newest environmental protection standard.
Anqing Municipal Solid Waste Incineration Power Plant
Location:AnqingTime:2010
Construction Location:Xijiaoshankou Xiang Anqing City Anhui Province, China
Area Covered:69713 sq.m
Construction Scale:Waste Handling Capacity: 1000 t/d; 365000 t/a
Equipments:Waste Incinerators: 2×500 t/d CFB incinerators(one prepared)
Steam Turbine-generators: 2×12 MW
Investment Scale:280 million yuan
Description:This plant adopts the CFB incinerators designed by Chinese Academy Of Sciences. And it is constructed by the national newest environmental protection standard.
Changde Municipal Solid Waste Incineration Power Plant
Location:ChangdeTime:2010
Construction Location:Hejiaping Village Deshan Development Zone Changde City Hunan Province, China
Area Covered:100 mu(67777 sq.m)
Construction Scale:Waste Handling Capacity: 800 t/d; 292000 t/a
Power Output: 99.2 million kWh/a
Equipments:Waste Incinerators: 2×500 t/d CFB incinerators(one prepared)
Steam Turbine-generators: 2×12 MW
Investment Scale:280 million yuan
Description:This plant adopts the CFB incinerators designed by Chinese Academy Of Sciences. And it is constructed by the national newest environmental protection standard.