PROJECTS
Others
Project description of Guangzhou Jinyi Auto Parts Co., Ltd
Location:GuangzhouTime:2009
An enterprise producing auto parts; total land area: 43,705 square meters; floor area: 24,052.5 square meters.
Lokshun Yunpu Industrial Park
Location:GuangzhouTime:2008
An enterprise producing numerical control machines; total land area: 61,713 square meters; floor area: 78,323 square meters.
Project description of Guangzhou Jinyi Auto Parts Co., Ltd
Location:GuangzhouTime:2009
An enterprise producing auto parts; total land area: 43,705 square meters; floor area: 24,052.5 square meters.
Lokshun Yunpu Industrial Park
Location:GuangzhouTime:2008
An enterprise producing numerical control machines; total land area: 61,713 square meters; floor area: 78,323 square meters.
SACMI Machinery (Nanhai, Foshan) Co.,Ltd
Location:FoshanTime:2007
An enterprise producing electrical machinery; a project of wholly foreign-owned venture.
SACMI Machinery (Nanhai, Foshan) Co.,Ltd
Location:FoshanTime:2007
An enterprise producing electrical machinery; a project of wholly foreign-owned venture.
Mitsubishi Heavy Industries Dongfang Gas Turbine(GuangZhou) Co.,Ltd.
Location:Nansha Economic technique zone (Guangzhou)Time:2004
Total area of 66,871 square meters with a total construction area of approximately 38,969.5 square meters. The first building area is 13,361.5 square meters. After the completion of the project, its annual output :dynamic and static turbine blades from 1-4 (4 sets of copies), burners 12 sets, dynamic and static turbine blades, burener painting and fittig 10 sets , annual maintenance dynamic and static turbine blades about 6 sets , l maintenance of burners 20 units.
Mitsubishi Heavy Industries Dongfang Gas Turbine(GuangZhou) Co.,Ltd.
Location:Nansha Economic technique zone (Guangzhou)Time:2004
Total area of 66,871 square meters with a total construction area of approximately 38,969.5 square meters. The first building area is 13,361.5 square meters. After the completion of the project, its annual output :dynamic and static turbine blades from 1-4 (4 sets of copies), burners 12 sets, dynamic and static turbine blades, burener painting and fittig 10 sets , annual maintenance dynamic and static turbine blades about 6 sets , l maintenance of burners 20 units.
Toyota Boshoku (Foshan) Auto Parts Co., Ltd
Location:FoshanTime:2005
An enterprise producing auto parts; capacity: 16 million superior metal parts and 230,000 electronic parts; land area of design: 80,000 square meters; floor area: 36,678 square meters.
Tokheim Hengshan Technologies(GuangZhou) Co.,Ltd.
Location:Science city (Guangzhou)Time:2005
The project site area is 23,451 square meters with a total construction area of 21,972 square meters. The project plans to produce IC Card Tax fuel refueling in 40000 shoot.
Toyota Boshoku (Foshan) Auto Parts Co., Ltd
Location:FoshanTime:2005
An enterprise producing auto parts; capacity: 16 million superior metal parts and 230,000 electronic parts; land area of design: 80,000 square meters; floor area: 36,678 square meters.
Tokheim Hengshan Technologies(GuangZhou) Co.,Ltd.
Location:Science city (Guangzhou)Time:2005
The project site area is 23,451 square meters with a total construction area of 21,972 square meters. The project plans to produce IC Card Tax fuel refueling in 40000 shoot.
Guangzhou Zhaohe Auto Parts Co., Ltd
Location:GuangzhouTime:2004
An enterprise producing auto parts; total land area: 75,000 square meters; floor area: 45,000 square meters.
GuangZhou LinJun Co.,Ltd
Location:YongHe Economic technique zone (Guangzhou)Time:2008
Area: 73321 m2. Three construction phases are totally about 15206 m2 with total investment of 30 million yuan. The overall size of an annual output of 1.2 million sets according to plan. This project is an expansion project and each phase was designed to produce 1 million sets annually.
Guangzhou Zhaohe Auto Parts Co., Ltd
Location:GuangzhouTime:2004
An enterprise producing auto parts; total land area: 75,000 square meters; floor area: 45,000 square meters.
GuangZhou LinJun Co.,Ltd
Location:YongHe Economic technique zone (Guangzhou)Time:2008
Area: 73321 m2. Three construction phases are totally about 15206 m2 with total investment of 30 million yuan. The overall size of an annual output of 1.2 million sets according to plan. This project is an expansion project and each phase was designed to produce 1 million sets annually.