古天乐代言太阳集团138_古天乐代言太阳集团

Location:HomeNewsCompany News

NEWS

(86)020-81326513

Guangzhou 4th Resource Thermal Power Plant Phase 2 Slag Treatment Project Was Put in Trial Run Edit Date:2021/03/31

       On 31st March 2021, Guangzhou 4th Resource Thermal Power Plant Phase 2 Slag Treatment Project was put in trial run. This project is located in Guangzhou Nansha district DaGang Advanced Manufacturing Base. Slag processing capacity is 1000 t/d, adopting "crushing + screening + wet gravity separation, water treatment system" technology, to implement screening metal and slag waste from incineration, and achieve reclamation, reduction and hazard-free treatment of slag, to effectively save landfill space. At the same time, the transportation cost of slag can be reduced, and environmental pollution can be avoided in the process of slag transportation.

       Our company as the project designer, in the case of limited time and heavy task, strictly implemented national related design standards and specifications and properly performed duties in the contract and from the perspective of professional technical and social considerations, timely solved related technical problems in construction to obtain comprehensive effect expected by the owner.

       As the first comprehensive slag treatment project formally put into trial operation under Guangzhou Environmental Protection Investment Group, its smooth operation played an important role for achieving zero discharge of pollutants in the process of slag resource treatment and getting through the “last kilometer” of waste treatment.

       In this project, our company has also made due contributions to improving the level of domestic waste treatment in Guangzhou and achieving the goal of zero landfill of urban domestic waste.